Bobick, T G (2004) Falls through Roof and Floor Openings and Surfaces, Including Skylights: 1992–2000. Journal of Construction Engineering and Management, 130(06), 895–907.

Chan, S and Leung, N (2004) Prototype Web-Based Construction Project Management System. Journal of Construction Engineering and Management, 130(06), 935–43.

Cheah, C Y J, Garvin, M J and Miller, J B (2004) Empirical Study of Strategic Performance of Global Construction Firms. Journal of Construction Engineering and Management, 130(06), 808–17.

Cheng, E W L and Li, H (2004) Development of a Practical Model of Partnering for Construction Projects. Journal of Construction Engineering and Management, 130(06), 790–8.

Cheung, S O, Yiu, K T W and Suen, H (2004) Construction Negotiation Online. Journal of Construction Engineering and Management, 130(06), 844–52.

Chung, T H, Abraham, D M and Gokhale, S B (2004) Decision Support System for Microtunneling Applications. Journal of Construction Engineering and Management, 130(06), 835–43.

Fang, D, Fong, P S and Li, M (2004) Risk Assessment Model of Tendering for Chinese Building Projects. Journal of Construction Engineering and Management, 130(06), 862–8.

Fang, D, Li, M, Fong, P S and Shen, L (2004) Risks in Chinese Construction Market—Contractors’ Perspective. Journal of Construction Engineering and Management, 130(06), 853–61.

Hanna, A S, Camlic, R, Peterson, P A and Lee, M (2004) Cumulative Effect of Project Changes for Electrical and Mechanical Construction. Journal of Construction Engineering and Management, 130(06), 762–71.

Koksal, A and Arditi, D (2004) Predicting Construction Company Decline. Journal of Construction Engineering and Management, 130(06), 799–807.

Lee, H, Yu, J and Kim, S (2004) Impact of Labor Factors on Workflow. Journal of Construction Engineering and Management, 130(06), 918–23.

Marzouk, M and Moselhi, O (2004) Fuzzy Clustering Model for Estimating Haulers’ Travel Time. Journal of Construction Engineering and Management, 130(06), 878–86.

Rowe, G M, Meegoda, J N, Jumikis, A, Sharrock, M J, Bandara, N and Hettiarachchi, C H (2004) NJTxtr—A Computer Program Based on LASER to Monitor Asphalt Segregation. Journal of Construction Engineering and Management, 130(06), 924–34.

  • Type: Journal Article
  • Keywords: Construction management; Asphalt pavements; Concrete pavements; Computer programs; Asphalt mixtures; New Jersey; State government;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2004)130:6(924)
  • Abstract:
    Abstract: This paper describes the research funded by the New Jersey Department of Transportation to develop an automated technology to monitor segregation during construction of hot-mix asphalt concrete pavements. A Laser-based system was used to measure surface texture and to detect segregation. Two segregated test sections and a control test section were tested to evaluate the applicability of Laser texture method to detect and quantify segregation. Laser texture data were gathered from all three sections. Ratios of texture in segregated areas to that in nonsegregated areas were set as the basis for detection of different levels of segregation. By combining the level of segregation and extent of segregation, an AREA index was developed to determine the acceptability of a pavement section. Based on AREA index, pay adjustment factors were proposed to reduce the payment to account for loss of pavement life due to segregation. Further remedial actions were proposed to correct segregated pavement sections with acceptable AREA index. Based on the above concepts, Windows-based computer program NJTxtr was developed to detect and quantify segregation. This computer program uses the Laser-equipment-collected pavement texture data and determines whether the pavement section is acceptable or unacceptable based on the level of segregation within a pavement section, and provides bonus or penalties to the contractor. The paper describes a novel technology using laser and associated software for construction quality control of asphalt concrete pavements. The proposed methodology was applied to detect segregation in an interstate highway section in New Jersey, and this section was repaved based on visual observation and recommendation from this study.

Senouci, A B and Eldin, N N (2004) Use of Genetic Algorithms in Resource Scheduling of Construction Projects. Journal of Construction Engineering and Management, 130(06), 869–77.

Son, J and Mattila, K G (2004) Binary Resource Leveling Model: Activity Splitting Allowed. Journal of Construction Engineering and Management, 130(06), 887–94.

Tam, C M, Tong, T K L and Wong, Y W (2004) Selection of Concrete Pump Using the Superiority and Inferiority Ranking Method. Journal of Construction Engineering and Management, 130(06), 827–34.

Thomas, H R, Horman, M J and de Souza, U E L (2004) Symbiotic Crew Relationships and Labor Flow. Journal of Construction Engineering and Management, 130(06), 908–17.

Tsao, C C Y, Tommelein, I D, Swanlund, E S and Howell, G A (2004) Work Structuring to Achieve Integrated Product–Process Design. Journal of Construction Engineering and Management, 130(06), 780–9.

Walsh, K D, Hershauer, J C, Tommelein, I D and Walsh, T A (2004) Strategic Positioning of Inventory to Match Demand in a Capital Projects Supply Chain. Journal of Construction Engineering and Management, 130(06), 818–26.

Whalen, T M, Gopal, S and Abraham, D M (2004) Cost-Benefit Model for the Construction of Tornado Shelters. Journal of Construction Engineering and Management, 130(06), 772–9.